References
Blocks B&C Retail
- Location:
- Silver Springs, MD
- Contractor:
- Foulger-Pratt Contracting, Inc.
P/M Seth Bolte: (301) 565-3038
- Architect:
- Brown & Craig, Inc.
(410) 837-2727
- Job Scope:
- Project consisted of base panels, feature strips, fascia panels and window sills in several different colors. Approximately 2,600 cubic feet of product.
The Metropolitain at Pentagon Row
- Location:
- Arlington, VA
- Contractor:
- Calvert Masonry, Inc.
P/M: Jim Engleright
(703) 519-7041 (ext.20)
- Architect:
- Weihe Design Group
(202)857-8300
- Job Scope:
- Project consisted of horizontal banding, site & balcony coping, window sills, main roof and penthouse coping. Approximately 1,800 cubic feet of product.
George Washington University
- Location:
- Washington, D.C.
- Contractor:
- Hitt Contracting, Inc.
P/M: Chris Urquhart
(703)846-9000 (ext.20)
- Architect:
- Einhorn-Yaffee-Prescott
(202)471-5000
- Job Scope:
- Project consisted of entrance surround panels, sills and lintels, large building sinage with logo's, cornice work and coping. Approximately 3,800 cubic feet of product.
Bethesda Palisades
- Location:
- Bethesda, MD
- Contractor:
- Genco Masonry, Inc.
P/M: Frank Clavelli
(301) 657-3340 ext. 108
- Architect:
- Compu Tecture/Archit's Collaborative
(301)770-8595
- Job Scope:
- Project consisted of extensive bands, sills, lintels, fluted fascia panels, balcony coping and sitework. Approximately 8,800 cubic feet of product.
Health Sciences Building
- Location:
- Silver Springs, MD
- Contractor:
- Manganaro Mid-Atlantic
P/M: Walter Monroe
(301)937-0580 ext. 232
- Architect:
- Einhorn-Yaffee-Prescott
(202)471-5000
- Job Scope:
- Project consisted of cast stone sills, base panels and parapet coping. Approximately 1,200 cubic feet of product.
Alexan at the Reston Town Center (South Building)
- Location:
- Reston, VA
- Contractor:
- United Masonry, Inc.
P/M: Carlos Sarmiento
(703)971-6840 ext. 318
- Architect:
- The Lessard Architectural Group
(703)760-9344
- Job Scope:
- Project consisted of planter wall copings, benches, entrance pilasters, window and door heads, keystones and medallions. Approximately 3,500 cubic feet of product.